Sector
- Commercial
Services
- Refurb
- On Time Delivery
- Constrained
- MEP
- Health & Safety
- Consultancy
- FF&E
Size
39 sqms
Partners
Chalk Creatives Direct
Comprehensive
CAT A & CAT B
fitout
The project involved a comprehensive CAT A & B fitout at Joe Blake’s bustling Ealing Broadway Station coffee shop. Chalk was tasked with delivering the approved design to completion, ensuring quality, efficiency, and timely handover.
Works undertaken
Fitout Services:
- Complete CAT A & B fitout, encompassing all foundational and finishing elements necessary to transform the space.
Partitioning and Finishes:
- Installation of partitioning to define space effectively, allowing for a layout that maximises both function and flow.
- High-quality wall and ceiling finishes, paired with floor tiling, to ensure durability and a polished aesthetic.
Joinery and Furniture:
- Installation of bespoke joinery and fitted furniture tailored to maximise utility and aesthetic appeal within the space.
- Provided flexible undercounter storage solutions to meet operational needs efficiently.
Mechanical and Electrical Coordination:
- Full M&E upgrade throughout the unit, ensuring reliable and compliant electrical and data cabling installations.
- Coordinated the integration of third-party specialist electrical installations, including sound systems.
Fire Safety and Compliance:
- Oversaw the installation of fire safety systems by third-party partners, ensuring compliance with safety standards and efficient integration with the overall design.